AIA Contract Documents #

The American Institute of Architects (AIA) produces a set of standard form contracts widely used in the construction industry in the United States.

Adjudication #

A process for resolving construction disputes whereby an independent third party, known as an adjudicator, makes a binding decision on the parties involved.

Alternative Dispute Resolution (ADR) #

Methods of resolving disputes outside of traditional court proceedings, including mediation, arbitration, and adjudication.

Arbitration #

A form of dispute resolution where the parties agree to have their dispute resolved by one or more arbitrators, whose decision is usually binding and enforceable.

Assignment of Contract #

The transfer of rights and obligations from one party to another under a contract.

Attornment #

The act of agreeing to recognize a new owner of the property as the landlord under a lease agreement.

Bid Bond #

A financial guarantee provided by a contractor to a project owner with a bid to secure the contractor's commitment to perform the work if awarded the contract.

Bid Documents #

The documents provided by the project owner to potential bidders, including the invitation to bid, instructions to bidders, and the bid form.

Bid Shopping #

The practice of disclosing a subcontractor's bid to other subcontractors in an attempt to obtain a lower bid.

Change Order #

A written agreement between the parties to a contract to modify the scope of work, price, or time for completion.

Claim #

A demand or assertion by one party seeking compensation or other relief for alleged breach of contract or other wrongdoing by another party.

Collateral Warranty #

A separate contract between a party not directly involved in the main contract and one of the parties to that contract, usually providing additional rights or protections.

Common Law #

The body of law developed through judicial decisions in English-speaking countries, as opposed to statutory law.

Compensation Event #

A term used in some forms of contract to describe events that may entitle the contractor to additional time or money.

Completion Certificate #

A document issued by the project owner certifying that the work has been completed in accordance with the contract.

Confidentiality Agreement #

A contract between parties to protect sensitive information shared during the course of their relationship.

Consequential Damages #

Damages that arise as a foreseeable result of a breach of contract but are not the direct result of the breach.

Consideration #

Something of value exchanged between the parties to a contract, essential for the contract to be legally binding.

Construction Management #

A professional service that involves overseeing the planning, design, and construction of a project on behalf of the project owner.

Contract #

A legally binding agreement between two or more parties that creates obligations to perform certain actions.

Contract Administrator #

A person responsible for the overall administration of a contract, including interpreting contract terms, issuing instructions, and managing disputes.

Contract Documents #

The written agreement, specifications, drawings, and other documents that form the contract between the parties.

Contractor #

The party responsible for carrying out the construction work under a contract.

Counterclaim #

A claim brought by a defendant against a plaintiff in response to the plaintiff's claim.

Defects Liability Period #

The period after completion during which the contractor is responsible for rectifying any defects in the work.

Delay Damages #

Compensation paid by a contractor to the project owner for delays in completing the work beyond the agreed-upon schedule.

Design #

Build: A project delivery method where the design and construction services are provided by a single entity.

Dispute Resolution Board (DRB) #

A panel of neutral experts established to resolve disputes that arise during the course of a construction project.

Drawings #

Graphic representations of the work to be performed, including plans, elevations, sections, and details.

Due Diligence #

The process of conducting a thorough investigation and assessment of a project before entering into a contract.

Estoppel #

A legal doctrine that prevents a party from asserting a right or defense that is inconsistent with a previous position or representation.

Express Warranty #

A specific promise made by one party to another regarding the quality or performance of the goods or services provided.

FIDIC Contracts #

The International Federation of Consulting Engineers (FIDIC) produces a widely used set of standard form contracts for construction projects worldwide.

Force Majeure #

An unforeseeable event beyond the control of the parties that prevents or delays the performance of a contract.

Guarantee #

A promise by one party to be responsible for the performance of another party under a contract.

Indemnity #

An agreement by one party to compensate another party for losses or damages incurred as a result of the contract.

Insolvency #

The inability of a party to pay its debts when they become due, leading to potential termination of the contract.

Interim Payment #

Payments made to the contractor at regular intervals during the course of the project, based on the work completed to date.

Joint Venture #

A business arrangement where two or more parties agree to combine their resources and expertise to undertake a specific project.

Liquidated Damages #

A predetermined amount of damages specified in the contract to be paid by one party to the other in the event of a breach.

Material Breach #

A serious violation of the terms of a contract that goes to the heart of the agreement, potentially entitling the innocent party to terminate the contract.

Mediation #

A voluntary process where a neutral third party assists the parties in reaching a mutually acceptable resolution of their dispute.

NDA (Non #

Disclosure Agreement): A contract between parties to protect confidential information shared during the course of their relationship.

Novation #

The substitution of a new party for one of the original parties to a contract, with the consent of all parties involved.

Offer and Acceptance #

The basic elements of a contract where one party makes an offer and the other party accepts it, forming a binding agreement.

Performance Bond #

A financial guarantee provided by a contractor to a project owner to ensure the completion of the work as specified in the contract.

Privity of Contract #

The relationship between the parties to a contract that gives them the right to enforce its terms.

Procurement #

The process of obtaining goods and services for a construction project, including sourcing, tendering, and contracting.

Quantum Meruit #

A legal principle allowing for the recovery of a reasonable sum for work done or services provided, even in the absence of a formal contract.

Retention #

A percentage of the contract sum withheld by the project owner to ensure the contractor's performance and the rectification of any defects.

Subcontractor #

A party engaged by the main contractor to perform specific aspects of the work under the main contract.

Termination #

The ending of a contract before all obligations have been fulfilled, either by agreement or due to a breach of contract.

Time Bar #

A provision in a contract that sets a deadline for giving notice of a claim or other contractual event.

Value Engineering #

A systematic process of analyzing the functions of a project to achieve the required performance at the lowest possible cost.

Variation #

A change to the contract documents initiated by the project owner or contractor that alters the scope, price, or time for completion.

Waiver #

The voluntary relinquishment of a right or claim under a contract, usually done through an express statement or conduct.

Withholdings #

Payments deducted from the contractor's invoices for reasons such as defects, non-compliance, or failure to meet contractual requirements.

Workmanship #

The quality of labor and skill applied in the construction of a project, including the standard of materials used and the execution of the work.

Written Notice #

Formal communication required by the contract to inform the other party of a specific event, claim, or change in the project.

This glossary provides a comprehensive overview of key terms and concepts relate… #

This glossary provides a comprehensive overview of key terms and concepts related to contract law and administration in construction, essential for professionals in the field to navigate the complexities of construction contracts effectively.

May 2026 cohort · 29 days left
from £90 GBP
Enrol